The 4160V Switchgear is a medium-voltage switchgear assembly for power receiving, distribution, switching and protection in 4.16kV electrical systems.
It is designed for industrial medium-voltage distribution lineups serving 4160V motor, transformer and feeder circuits

Technical Specifications
|
Parameter |
Specification |
|
Product |
4160V Medium Voltage Switchgear |
|
Nominal System Voltage |
4160V / 4.16kV |
|
Voltage Class |
5kV |
|
Rated Maximum Voltage |
4.76kV |
|
Rated Frequency |
50 / 60Hz |
|
Number of Phases |
3 |
|
Main Bus Current |
1200 / 2000 / 3000A |
|
Rated Short-Circuit Current |
25 / 31.5 / 40 / 50kA configurations |
|
Power-Frequency Withstand |
19kV |
|
BIL |
60kV |
|
Circuit Breaker |
Withdrawable vacuum circuit breaker |
|
Main Bus |
Copper busbar |
|
CT |
Protection and metering |
|
VT |
According to project protection and metering requirements |
|
Protection Relay |
Microprocessor-based protection relay |
|
Enclosure |
Metal-clad, compartmentalized |
|
Installation |
Indoor |
4160V Switchgear Construction
Circuit Breaker Compartment
The withdrawable vacuum circuit breaker is housed in a dedicated compartment separated from the main bus and cable areas.
Main Bus Compartment
The main bus compartment houses the copper busbars connecting the incoming and feeder sections of the lineup.
Cable Compartment
The cable compartment provides the termination area for incoming and outgoing medium-voltage cables.
Cable quantity, conductor size, termination arrangement and cable entry direction are incorporated into the approved project layout.
Protection and Control Compartment
The low-voltage compartment houses the secondary wiring and control equipment for protection, measurement, indication and control.
Typical 4160V Power Distribution Configurations
Incoming Power Distribution
4160V Source → 4160V Switchgear → Main Bus → Feeder Sections
Incoming sections receive 4.16kV supply and distribute power through the main bus to dedicated outgoing feeders.
Motor Feeder Distribution
4160V Main Bus → Motor Feeder → 4160V Motor
A motor feeder provides a dedicated switching point between the 4160V bus and an individual medium-voltage motor circuit.
Transformer Feeder Distribution
4160V Main Bus → Transformer Feeder → Transformer → LV Distribution
A transformer feeder transfers power from the 4160V bus to the transformer primary, forming the connection between medium-voltage and lower-voltage distribution.
Bus-Tie Arrangement
4160V Bus Section A → Bus Tie → 4160V Bus Section B
A bus-tie section links two bus sections within the 4160V lineup where the distribution scheme requires sectionalized bus operation.
Combined Lineup
Incoming → Main Bus → Motor Feeders / Transformer Feeders / Bus Tie → Downstream Loads
A complete 4160V lineup can combine incoming, motor, transformer and bus-tie sections to match the one-line distribution arrangement.
4160V Feeder Engineering
Motor Feeder
4160V Switchgear → Motor Feeder → 4160V Motor
Motor feeder configuration is established from motor rated power, rated current, starting characteristics and required protection.
Transformer Feeder
4160V Switchgear → Transformer → LV Distribution
Transformer feeder configuration is established from transformer MVA, primary current, impedance, inrush characteristics and downstream protection requirements.
Fault Duty
Available fault current at the switchgear installation point is used to verify the required circuit breaker interrupting capability and switchgear withstand rating.
Protection
Protection functions, CTs, VTs and relay settings are established from the feeder type and approved protection scheme.
Manufacturing Capability
Enclosure Fabrication
Cabinet structures are fabricated to the released engineering drawings, including the required dimensions, compartment arrangement and panel interfaces.
Copper Busbar Processing
Copper busbars are processed and prepared for the specified primary circuit arrangement before installation in the switchgear lineup.
Primary Component Assembly
Withdrawable vacuum circuit breakers and other primary components are installed according to the approved equipment configuration and electrical drawings.
Secondary Wiring
Protection, control, indication and measurement circuits are wired according to the approved schematics and terminal requirements.
Production & Testing Equipment
WWE operates more than 120 sets of production and testing equipment supporting switchgear fabrication, assembly and product testing.
FAQ
Q: What is the MOQ for 4160V switchgear?
A: The MOQ can be 1 complete switchgear lineup. The final quantity depends on the number of panels and feeder sections required for the project.
Q: What is the typical lead time for 4160V switchgear?
A: A typical engineered switchgear project is commonly scheduled at approximately 12–18 weeks after technical clarification and drawing approval. Special components, complex configurations or customer witness testing may require additional time.
Q: What payment terms are available for 4160V switchgear?
A: International B2B switchgear orders commonly use an advance payment with the balance paid before shipment or against agreed project milestones. The exact payment schedule is stated in the commercial quotation and purchase contract.
Q: Can WWE manufacture 4160V switchgear according to customer specifications?
A: Yes. Customer specifications and project requirements can be reviewed during technical clarification, with production based on the approved engineering drawings and agreed technical configuration.
Q: Can 4160V switchgear drawings be submitted for customer approval?
A: Yes. General arrangement drawings, electrical schematics and wiring diagrams can be submitted for customer review and approval according to the agreed project documentation procedure.
Q: Can WWE support 4160V switchgear retrofit projects?
A: Yes. Retrofit requirements can be evaluated from the existing switchgear drawings, installed component information, site dimensions and required electrical ratings before the replacement or modification scope is defined.
Q: Can a factory acceptance test be arranged for 4160V switchgear?
A: Yes. FAT can be arranged when specified in the purchase contract, with the test scope and customer witness requirements agreed before the inspection.
Q: Can customers arrange pre-shipment inspection?
A: Yes. Customer or third-party pre-shipment inspection can be arranged according to the agreed inspection procedure and purchase contract.
Q: Are spare parts available for 4160V switchgear?
A: Recommended spare parts can be specified from the installed component configuration and included in the quotation when required.
Q: What information should be provided when requesting a quotation for 4160V switchgear?
A: The quotation request should include the single-line diagram, feeder list, required bus current, short-circuit level, motor or transformer data and project-specific technical requirements.