Medium Voltage Metal Enclosed Switchgear

Medium Voltage Metal Enclosed Switchgear

Medium Voltage Metal Enclosed Switchgear is an indoor withdrawable medium voltage metal enclosed switchgear assembly for three-phase AC power distribution at 50 Hz. It combines medium-voltage switching, protection, measurement and control equipment within a compartmentalized metal enclosure.
Send Inquiry
Description
Technical Parameters

Medium Voltage Metal Enclosed Switchgear is an indoor withdrawable medium voltage metal enclosed switchgear assembly for three-phase AC power distribution at 50 Hz. It combines medium-voltage switching, protection, measurement and control equipment within a compartmentalized metal enclosure.

 

Electrical Ratings

 

Parameter

Specification

Model

KYN28-12

Rated Voltage

3 / 6 / 10 / 12 kV

Rated Frequency

50 Hz

Rated Current

630–3150 A

Rated Short-Time Withstand Current

20 / 25 / 31.5 / 40 kA

Rated Peak Withstand Current

50 / 63 / 80 / 100 kA

Rated Short-Circuit Duration

4 s

Power-Frequency Withstand Voltage

42 kV / 1 min to ground; 48 kV / 1 min across open contacts

Lightning Impulse Withstand Voltage

75 kV to ground; 85 kV across open contacts

Enclosure Protection

IP4X

Internal Partition Protection

IP2X

Busbar Arrangement

Single busbar / sectionalized single busbar

Circuit Breaker

Withdrawable vacuum circuit breaker

 

Functional Configuration


Incoming Feeder
Connects the incoming medium-voltage source to the main busbar. The panel function is defined by the incoming circuit arrangement and required switching and protection functions.


Outgoing Feeder
Connects the busbar to downstream distribution circuits. The panel is configured according to the feeder function and required switching, protection and measurement equipment.


Transformer Feeder
Provides the medium-voltage connection between the switchgear and transformer primary circuit. The panel configuration follows the transformer connection and associated protection requirements.


Bus Section
Connects or separates two busbar sections in a sectionalized single-busbar arrangement. The panel configuration is determined by the required bus sectionalizing and switching scheme.


Metering Panel
Provides the dedicated arrangement for medium-voltage measurement. The installed measurement equipment is defined by the project's metering scheme.

 

IMG2159
IMG2161

 

Operating Design


Withdrawable Circuit Breaker: The vacuum circuit breaker is mounted on a withdrawable truck with defined service, test and isolation positions.


Primary Circuit Isolation: Moving the truck from the service position separates the breaker from the fixed primary contacts, while the shutter closes the corresponding contact access.


Maintenance Access: The breaker can be withdrawn for inspection or maintenance while the fixed switchgear enclosure remains installed.

 

Safety Features


Mechanical Interlocking:Mechanical interlocks control specified operating sequences between the circuit breaker, grounding mechanism, cabinet access and secondary connection.


Grounding Connection:A continuous grounding busbar connects the cabinet sections and provides the conductive path for bonding the switchgear structure and designated grounding points.


Pressure Relief:Pressure relief devices are positioned above the relevant internal sections to provide a defined release path for abnormal internal pressure.

 

Component Configuration

 

product-1170-891

Primary Circuit

  • Withdrawable vacuum circuit breaker
  • Main busbar
  • Branch busbar
  • Current transformer
  • Voltage transformer where specified
  • Earthing switch
  • Lightning arrester


Secondary Circuit

  • Protection relay
  • Metering devices
  • Control switches
  • Indication devices
  • Secondary terminals
  • Auxiliary circuits


Project-Defined Components
The required combination of primary and secondary equipment is confirmed from the approved single-line diagram, protection scheme, metering requirements and project bill of materials.

 

Engineering Selection


Fault Level
Provide the prospective short-circuit current at the switchgear installation point to determine the required short-time and peak withstand ratings.


Load Current
Provide the continuous current required for each feeder and busbar section.


Cable Arrangement
Confirm cable quantity, conductor size, termination method and entry direction before finalizing the cable compartment design.


Protection Scheme
Provide the required protection functions, CT requirements and relay interfaces for secondary circuit design.


Site Conditions
Declare altitude, ambient temperature and abnormal environmental conditions when they fall outside the specified operating range.

 

Factory Quality Control


Mechanical Operation Test
The withdrawable circuit breaker is operated through the defined service, test and isolation positions. Operating movement and sequence are checked against the specified requirements, with the test result recorded.


Interlock Verification
The specified interlocking functions between the circuit breaker, grounding mechanism and related operating components are checked under the defined operating conditions. The verification result is recorded before final release.


Contact Resistance Test
Primary circuit contact resistance is measured after assembly. The measured values are checked against the applicable test criteria and recorded in the inspection documentation.


Insulation Test
Insulation withstand testing is performed according to the applicable test procedure and project requirements. Test results are recorded for the completed panel.


Secondary Circuit Verification
Control wiring, terminal connections and auxiliary circuits are checked against the approved electrical schematics. Wiring verification results are recorded as part of the inspection documentation.


Visual and Dimensional Inspection
Panel dimensions, component installation, identification marks, enclosure condition and visible assembly details are checked against the approved drawings. Inspection results are documented before shipment.

 

FAQ

 

Q: Can the purchaser approve the drawings before production?

A: Yes. Production can proceed after the required technical drawings have been submitted and approved according to the agreed project procedure.

Q: Can panel numbers and feeder names follow the purchaser's document system?

A: Yes. Panel identification, feeder names and equipment tags can follow the numbering and naming conventions specified in the approved project documents.

Q: Can specified component brands be incorporated into the order?

A: Brand-specific component requirements can be reviewed during technical clarification. Final selection is confirmed based on the required electrical ratings, interfaces and project specifications.

Q: Can the switchgear replace equipment in an existing installation?

A: Yes, subject to a technical compatibility review covering the existing electrical ratings, panel dimensions, cable connections, busbar arrangement and control interfaces.

Q: Can a third-party inspection be arranged before shipment?

A: Yes. Purchaser or third-party inspection can be included in the agreed inspection plan, with the inspection scope and witness points defined before production or testing.

Q: Can spare parts be supplied with the switchgear?

A: Yes. Spare parts can be quoted according to the installed component configuration and the purchaser's specified maintenance requirements.

Q: How are technical changes handled after drawing approval?

A: Any change affecting the approved design is subject to technical review before implementation. Revised drawings and production documents are updated according to the agreed revision procedure.

Q: Can purchaser-specific documentation procedures be followed?

A: Yes. Document formats, revision numbering, submission stages and approval procedures can be defined during project clarification.

Q: What information should be included in an RFQ for KYN28-12?

A: An RFQ should normally include rated voltage, rated current, short-circuit level, single-line diagram, panel functions, cable requirements, protection and metering requirements, site conditions, applicable standards and required documentation.

Q: What is the minimum order quantity for KYN28-12?

A: The order quantity is determined by the project scope and required panel configuration. The quotation can cover individual panels or a complete switchgear lineup according to the purchaser's requirements.

Q: How is the switchgear packaged for shipment?

A: Packaging is determined according to the switchgear configuration, shipment method and destination. The equipment is protected against handling and transportation conditions before dispatch.

Q: What is the production lead time after order confirmation?

A: Lead time depends on the confirmed technical configuration, component selection, drawing approval and order quantity. The applicable schedule is stated in the quotation or order confirmation.

Q: Can export documentation be provided with the shipment?

A: Yes. The required commercial and shipping documents can be prepared according to the agreed export requirements and destination documentation requirements.

Hot Tags: medium voltage metal enclosed switchgear, China medium voltage metal enclosed switchgear manufacturers, suppliers, factory, 35kV High Voltage Switchgear, Medium Voltage Cubicle, Medium Voltage Metal Clad Switchgear, Medium Voltage Switchgear Manufacturers, Mv Switchgear Manufacturers, Mvsg Electrical