The XGN2-10 is a fixed metal-enclosed medium voltage switchgear for indoor power reception and distribution in three-phase AC systems.
Technical Specifications
|
Parameter |
Specification |
|
Product Series |
XGN2-10 |
|
Product Type |
Fixed metal-enclosed medium voltage switchgear |
|
Rated Voltage |
3.6 kV / 7.2 kV / 12 kV |
|
Rated Frequency |
50 Hz |
|
Phase |
Three-phase AC |
|
Installation |
Indoor |
|
Primary Switching Device |
Vacuum contactor / vacuum circuit breaker |
|
Power-Frequency Withstand Voltage |
42 kV, 1 min |
|
Withstand Voltage Across Separate Fracture |
48 kV, 1 min |
|
Lightning Impulse Withstand Voltage |
75 kV |
|
Lightning Impulse Withstand Across Separate Fracture |
85 kV |
|
Vacuum Arc-Chute Service Life |
1,000 operations |
|
Isolating / Earthing Switch Service Life |
2,000 operations |
|
Applicable Standards |
GB 3906; IEC 60298 |
|
Certification / Marking |
CCC |
Internal Construction
The XGN2-10 is presented as the fixed metal-enclosed switchgear arrangement, while the related HXGN series covers ring-network and terminal distribution configurations.
Fixed Metal-Enclosed Structure
The XGN2-10 uses a fixed metal-enclosed cabinet structure, with the primary equipment remaining in a fixed operating position rather than being arranged as a withdrawable assembly.
Primary Circuit Arrangement
The cabinet houses the primary circuit together with the switching, isolation and earthing components required for the specified electrical arrangement.
HXGN Ring Main Unit Structure
The related HXGN series uses a compact metal-enclosed ring main unit construction for ring-network and terminal distribution arrangements.
Switching, Protection & Interlocking
Vacuum Switching
The XGN2-10 uses a vacuum contactor or vacuum circuit breaker as the primary switching device, depending on the circuit switching function.
Five-Prevention Interlocking
The switchgear incorporates a five-prevention interlocking function that restricts specified incorrect operating sequences during switching and isolation operations.
The interlocking mechanism links defined operating actions with their required conditions, preventing specified operations from being performed in an incorrect sequence.
Load Switch–Fuse Protection
For HXGN configurations using a load switch–fuse combination, the load switch performs load-current switching while the fuse provides overload and short-circuit protection for applicable transformer and distribution circuits.
Configuration
XGN2-10 Circuit Arrangement
The XGN2-10 is arranged for fixed medium voltage power reception and distribution circuits. The primary switching arrangement is selected according to the required circuit function and switching duty.
HXGN Circuit Arrangement
The HXGN series is arranged for ring-network or terminal distribution circuits. The primary arrangement can use a load switch or a load switch–fuse combination according to the circuit function.
Applications
Indoor Medium Voltage Distribution
The XGN2-10 is used for indoor medium voltage power reception and distribution.
Ring-Network Distribution
HXGN configurations are used at distribution points within ring-network systems where medium voltage switching is required.
Terminal Distribution
HXGN configurations are used in terminal distribution arrangements requiring a compact metal-enclosed medium voltage switching assembly.
Transformer Distribution
HXGN load switch–fuse configurations are used for transformer distribution circuits where combined load switching and fuse protection are required.
Engineering & Technical Review
Electrical Requirement Review
WWE reviews the electrical requirements, drawings and project specifications to determine the required switchgear arrangement and equipment configuration.
Engineering Drawing Development
The agreed switchgear arrangement is documented through engineering drawings before production.
Configuration Verification
WWE checks the proposed equipment arrangement against the submitted electrical requirements and project drawings before production.
Production Release
The verified arrangement is released for production.
FAQ
Q: What is the minimum order quantity for XGN2-10 medium voltage switchgear?
A: The minimum order quantity is 1 set. Multiple sets can be supplied for projects requiring several switchgear panels.
Q: What is the typical lead time for XGN2-10 switchgear?
A: The typical production lead time is 20 days after order confirmation and finalization of the technical requirements.
Q: What payment terms are available for medium voltage switchgear orders?
A: T/T and L/C are standard payment options for export orders. The payment schedule is specified in the commercial contract before production starts.
Q: What warranty is provided for XGN2-10 switchgear?
A: XGN2-10 switchgear is covered by a 12-month warranty for manufacturing and material defects, subject to the warranty terms specified in the sales contract.
Q: Can XGN2-10 switchgear be inspected before shipment?
A: Yes. Pre-shipment inspection can be arranged before delivery. The inspection can cover equipment configuration, appearance, nameplate information, wiring and specified routine inspection items included in the purchase order.
Q: Can spare parts be supplied for XGN2-10 switchgear?
A: Yes. Spare parts can be supplied with the equipment or ordered separately according to the installed switchgear configuration.
Q: What shipping terms are available for medium voltage switchgear?
A: FOB, CIF and EXW are standard Incoterms used for applicable export orders. The selected Incoterm is specified in the commercial contract together with the destination and shipment arrangement.