LV and HV Switchgear is a metal-enclosed switchgear assembly configured for 3–10 kV medium-voltage power distribution systems. It is used in substations, industrial power distribution systems, transformer substations and medium-voltage motor circuits.
Technical Specifications
|
Parameter |
Specification |
|
Rated Voltage |
3.6 / 7.2 / 12 kV |
|
Operating Voltage |
3 / 6 / 10 kV |
|
Rated Current |
630–5000 A |
|
Rated Frequency |
50 Hz |
|
Rated Short-Time Withstand Current |
20 / 25 / 31.5 / 40 kA |
|
Short-Time Duration |
Up to 4 s |
|
Rated Peak Withstand Current |
50 / 63 / 80 / 100 kA |
|
Switching Device |
Vacuum Circuit Breaker |
|
Circuit Breaker Options |
VS1 / CD4 |
|
Insulation Medium |
Air |
|
Installation |
Indoor |
|
Enclosure Protection |
IP4X |
|
Internal Compartment Protection |
IP2X |
|
Maintenance Arrangement |
Front access |
Rated Insulation Level
|
Rated Voltage |
Power-Frequency Withstand |
Lightning Impulse Withstand |
|
3.6 kV |
10 kV |
40 kV |
|
7.2 kV |
20 kV |
60 kV |
|
12 kV |
28 kV |
75 kV |
Compartmentalized Construction
Busbar Compartment
Contains the main busbar system, branch connections and insulation supports. Busbar configuration is selected according to the required current and short-circuit ratings.
Vacuum Circuit Breaker Compartment
Houses the withdrawable vacuum circuit breaker and primary connection system, with defined service, test and isolated positions.
Cable Compartment
Provides space for MV cable termination and specified CTs, PTs, earthing switches, surge arresters and primary connections.
Secondary Instrument Compartment
Contains protection relays, metering devices, control components, terminal blocks and auxiliary circuits defined by the approved protection scheme.
Pressure Relief Arrangement
The enclosure includes a defined pressure-relief path for internal fault conditions. The relief direction and enclosure arrangement are determined according to the panel design and project requirements.
Withdrawable Vacuum Circuit Breaker
The withdrawable vacuum circuit breaker separates the switching device from the fixed primary circuit during defined inspection, testing and servicing operations.
The breaker can be moved between specified service, test and isolated positions. This arrangement permits breaker removal or replacement without dismantling the complete switchgear enclosure.
The selected breaker rating is matched with the switchgear rated current, short-circuit withstand level and system voltage.



Mechanical Interlocking
The interlocking system controls the operating sequence of the withdrawable circuit breaker, earthing switch and compartment access.
- Service, test and isolated breaker positions
- Breaker racking only with the breaker in the required operating state
- Earthing switch operation restricted by breaker position
- Compartment access interlocked with the switching position
- Mechanical position indication for breaker and earthing switch
Interlocking functions are verified by checking breaker racking, earthing switch operation and access conditions across the defined operating positions.
Feeder Configurations
Incoming Feeder: Source rating, incoming protection and busbar connection
Outgoing Feeder: Load current, feeder protection and cable connection
Bus Coupler: Bus-section arrangement and switching scheme
Transformer Feeder: Transformer rating, primary cable and protection
Motor Feeder: Motor rating, starting method and protection

Engineering Review Before Production

Each switchgear order goes through a technical review before production. The engineering team works from the approved SLD, equipment schedule, layout drawings and secondary circuit documents to define the final panel configuration.
Single-Line Diagram
Incoming sources, feeder functions, bus sections and switching relationships are reviewed against the required distribution scheme.
Primary Equipment
Circuit breaker ratings, CT/PT requirements, protection devices and primary connections are matched to the specified electrical parameters.
Panel Layout
Panel dimensions, busbar arrangement, cable entry, component locations and front maintenance access are defined before fabrication.
Secondary Circuits
Protection, metering, control wiring and terminal connections are coordinated with the approved schematic and wiring drawings.
Production Release
The approved electrical ratings, panel sequence, primary components and secondary configuration are consolidated into the manufacturing documents used for production.
Quality Control & Inspection Records
Inspection is performed against the approved drawings, equipment list and specified test requirements, with key results recorded before dispatch.
Component & Assembly Check
Circuit breaker, CT/PT and protection components are verified against the approved equipment list. Cabinet dimensions, panel alignment, clearances and busbar installation are checked against released drawings.
Circuit & Wiring Check
Primary connections, grounding points and secondary wiring are verified against the approved circuit diagrams.
Mechanical & Electrical Testing
Withdrawable mechanism, breaker movement and interlocking sequence are checked through defined operating positions. Insulation resistance, dielectric withstand and circuit continuity tests are performed according to the confirmed test requirements.
Final Release
Panel identification, component configuration and shipment records are checked against the approved order before dispatch.
FAQ
Q: What is the MOQ for LV and HV Switchgear?
A: MOQ starts from 1 switchgear panel. Multi-panel project orders can be supplied according to the required lineup and feeder configuration.
Q: What is the typical lead time for LV and HV Switchgear?
A: Typical lead time is 30–60 days after technical approval, drawing confirmation and order release. Projects with larger panel quantities, customized components or additional testing may require a longer schedule.
Q: Can I order a single switchgear panel?
A: Yes. 1 panel can be ordered for replacement projects, additional feeder sections, testing requirements or small distribution systems.
Q: How is switchgear packaged for international shipment?
A: Each panel is protected with protective wrapping, internal cushioning and moisture protection before shipment. Reinforced wooden cases are commonly used for export transportation, with packing dimensions and weight confirmed before dispatch.
Q: Can multi-panel switchgear be shipped in separate sections?
A: Yes. A complete lineup can be divided into 2 or more transport sections when overall dimensions, lifting capacity or site access require sectional shipment. The shipping arrangement is confirmed during engineering review.
Q: Can spare parts be supplied with the switchgear?
A: Yes. Spare parts can be supplied with the main order. A recommended spare-parts package can typically cover 1–2 years of normal maintenance requirements, depending on the selected breaker and auxiliary components.
Q: Can you quote replacement switchgear for an existing installation?
A: Yes. Replacement projects can be evaluated from the existing equipment nameplate, drawings, dimensions, cable interfaces and electrical specifications. Existing equipment information can be reviewed before quotation.
Q: Can you provide OEM or private-label switchgear?
A: Yes. OEM requirements can cover nameplates, product identification, documentation and agreed project-specific details. The final OEM scope is confirmed before production.
Q: Can customers arrange a pre-shipment inspection?
A: Yes. Customer or third-party inspection can be arranged before shipment. Inspection is normally scheduled 3–7 days before the planned dispatch date, with the scope agreed in advance.
Q: What documents are supplied with an international switchgear shipment?
A: Standard shipment documentation can include Commercial Invoice, Packing List and shipping documents. Technical drawings, inspection records and test records can be supplied according to the agreed project documentation requirements.